Weekly maintenance content precautions for hand placement machine:
Weekly placement machine maintenance content
1. Do spot inspection first to check whether the gas distribution pipes joints are leaking, whether the unit cylinders are working normally.
2. Check whether the conveyor belt, pulleys, flaps are damaged. Immediately repair replace the damaged ones.
3. Remove all NOZZLE the ATC put it into the ultrasonic cleaning (add alcohol to the ultrasonic), remove it after about 5 minutes, blow it off with an air gun, then apply a small amount of 1 # oil on the cotton swab to apply on the head. , Pay attention to 505, 506, 507, 508 other heads NOZZLE when cleaning must be with the rubber head facing up, must be stained with alcohol.
4. After wiping the ACT slider with a white cloth, add a small amount of 1 # oil to the fixing screw of the movable slider.
5. Use a white cloth strip to insert the cylinder, belt, slider, width adjustment wire of the conveyor, wipe it clean add a small amount of 1 # oil to the stops pulleys, add a small amount of layer of butter on the width adjustment wire plug.
6. Wipe the XY linear guides clean with a white cloth strip re-add a thin layer of printer butter.
7. Wipe the LASER WINDOW with lens paper.
8. Retest all NOZZLE times in SET UP save exit.
9. Check the LASER curve in the manual menu wipe it clean.
10. After opening the front cover warming up slowly for 2 minutes, wipe off the excess butter with a white cloth strip.
Precautions for weekly maintenance of second-hand placement machine:
1. Pay attention that all belts must be stained with grease during maintenance.
2. Do add too much oil to the NOZZLE after cleaning.
3. LASERWINDOW should be cleaned with any chemical solvent.
4. The NOZZLE on ATC should be returned to its original position after maintenance.
13962439646
Address: No. 259 Songjiagang Road, Zhoushi Town, Kunshan City, Suzhou City, Jiangsu Province
Email: srd@kunshansmt.cn