Used smt mounter
二手贴片机厂家
your current location : Home >> News >> company news

Familiar with the application requirements of second-hand placement machine

2019-11-30
times

Hand Mounter Application Requirements


The equipment acceptance should leave the original record, prepare the acceptance lecture based on the original record to form the acceptance conclusion. Predictive maintenance methods-These methods may include reviews of appropriate items: such as manufacturer recommendations, tool wear, optimization of uptime, the correlation between statistical process control data for second-hand placement machines preventive maintenance flows. Damage to the important characteristics of the tooling; equipment should be repaired when the phenomenon of equipment accuracy decline, abnormal operation, etc. There are many types of equipment maintenance programs: you should decide which equipment maintenance program to take based on the importance of the equipment.


Equipment Acceptance Confirmation (AQ): Confirmations made when the equipment is accepted include:


1. Packaging confirmation: The packaging of the equipment meets the transportation requirements, without damage, damage to the equipment surface precision instruments.


2. Equipment confirmation: whether the equipment name, specifications, model, manufacturer, new old level meet the contract requirements.


3. Confirmation of equipment parts: Whether the equipment parts, spare parts, testing instruments auxiliary parts meet the contract requirements. Confirmation of second-hand placement machine documents: whether various technical documents, drawings, imitation orders other documents meet the contract requirements. Equipment Process Qualification (PQ): Equipment process is the verification of the quality of the products produced by the equipment. Generally, at least three batches should be implemented on the premise of complete consistency to verify the reproducibility confusion of the results. The general steps for equipment process validation are:


1. Formulate production process;


2. Determine the inspection methods technical standards for product quality;


3. Implement sampling confirmation.


Production need: should meet production needs; functional suitability: equipment accuracy, use reliability, technical indicators models meet corporate requirements; physical state suitability: equipment volume, size, occupied space, second-hand placement machine environmental requirements, etc. Suitable for the needs of enterprises; Durability of parts: When the equipment is purchased, the anti-wear erosion resistance of the components should be considered; Maintainability of the equipment: The components should be easily replaced, the equipment is easy to maintain, disassemble, assemble, energy saving: save raw materials Low energy consumption of electricity, gas, water oil. Environmental protection: easy to meet the needs of clean production green production; safety: measures to prevent personal safety, measures to control human health; completeness of equipment: easy to control quality shorten production time. Preparation for acceptance is to comprehensively test verify the purchased equipment according to technical indicators, process requirements, etc., in order to meet the production requirements product quality requirements

smt mounter repair wholesale

National Hotline

13962439646

Address: No. 259 Songjiagang Road, Zhoushi Town, Kunshan City, Suzhou City, Jiangsu Province
Email: srd@kunshansmt.cn

Suzhou patch processing

Copyright © Kunshan Senruida Electromechanical Equipment Co., All rights reserved record number: Su ICP No.19071549 Specializing in Used smt mounter, used mounter manufacturers, smt mounter recycling